Bermans Way

Demolition of disused garages to construct a modern and elegant 2-bedroom bungalow in the vibrant area of Neasden. The property has been thoughtfully designed to provide a comfortable and functional living space while being energy efficient. The house will offer a contemporary living experience with easy access to essential amenities and transportation. The project was completed to a high specification, on time and too budget.

The Loughton Surgery

Addition of a new first floor in loft space to accommodate new doctors rooms, waiting area and GP Practice offices including installation of a new lift. Ground floor extension and refurb to modernise and accommodate more facilities.

Dollis Road

Rear and roof extension to existing house along with a full refurb. Demolition of outbuildings to the side to accommodate 2 new build semi detached houses.

Barretts Grove

Conversion of a former factory and office building into 6 self-contained flats and 2 houses.

Regents Park Road

Demolition of existing hotel/bed and breakfast and construction of new building to accommodate luxurious 6 self-contained flats and a penthouse.

Selvage Lane

Demolition of three dwellings and construction of two new build blocks accommodating nine self-contained flats and associated parking spaces.

Marven Medical Practice

Conversion off disused basement car park to treatment rooms, GP Consulting rooms, practice offices and patient waiting areas. The existing doctors surgery was then had alteration and refurbishment works carried out to accommodate more rooms and a Pharmacy.

Devonshire Road

Demolition of existing bungalow and new build 3 houses. 2 x 4 bedroom and 1 x 5 bedroom.

Oliver Plaza Hotel

Structural alterations and refurbishment to existing hotel to accommodate new additional floors increasing room capacity from 32 to 49 rooms. Complete refurbishment to modernise the look off the hotel.

The Approach

Demolition of a detached dwelling with structural issues. Construction of a four-bedroom house and a two-bedroom house with high specification fittings and custom joinery installations. The properties were built to accommodate environmentally friendly features such as solar hot water systems and air source heat pumps for hot water and heating.

Court House

Conversion of Old Magistrates Court too 9 self-contained flats. Works included extending original building and structural alterations to existing to accommodate flats.

20 Calvin Street, E1

Demolition of two derelict warehouses to accommodate a part 5 and part 6 story building. Consisting of 24 self-contained flats and three B1 commercial units